Tons Of Material Left Behind By The Failed Nulife Bristol Plant Are Being Shipped Out. The Action Is To Remove Millions Of Pounds Of Lead-Laden Televisions And Computer Monitor Screens That Were Stored In Two Bristol, Virginia Locations. So Far, Five Million Of The Nearly 40 Million Pounds Of Waste Have Been Hauled Away. Nulife Was In The Process Of Starting Up A Smelting Operation, But Left Town In June. All Of The Materials Is Being Shipped To Pennsylvania To Be Destroyed.