Phase One Of Repairs In A Three-Phase Process At The Bristol, Virginia Landfill Is Complete.  So Far, Existing Pipelines Have Been Repaired, Additional Piping Has Been Installed To Maximize Collecting Landfill Gas And A Pumping Station Has Been Installed To Remove Excess Water. There Are Two More Phases To Be Done In The 140-Thousand Dollar Project.